Petrochemical Design ›› 2021, Vol. 38 ›› Issue (1): 62-64.doi: 10.3969 /j.issn.1005-8168.2021.01.017

• PIPING TECHNOLOGY • Previous Articles     Next Articles

Study on Shortening the Calculation and Selection Time of Large Pipe Support of Towers

Zhou Aihui   

  1. CNOOC Petrochemical Engineering Co., Ltd., Qingdao, Shandong, 266101
  • Received:2020-06-12 Accepted:2020-06-12 Online:2021-02-23 Published:2021-02-23
  • Contact: Zhou Aihui,zhouaih@cnooc.com.cn E-mail:zhouaih@cnooc.com.cn

Abstract: By analyzing the process and methods of manually calculating and selecting large pipe support of towers, it was concluded that various parameters, large amount of manual calculation and repeated checking were the main reasons for the difficult and time-consuming calculation and selection. A calculation program was written to change the current calculation and selection of large pipe support of towers, and its application effect was tested with an example. Practice has proved that by writing the calculation program, the calculation and selection time of large pipe support of towers was shortened, and the problems of low manual calculation efficiency and error-proneness were solved, providing a fast and effective calculation tool for the calculation and selection of large pipe support of towers.

Key words: large pipe of tower, support, calculation and selection