Petrochemical Design ›› 2019, Vol. 36 ›› Issue (2): 65-68.doi: 10.3969/j.issn.1005-8168.2019.02.017
• OVERVIEW • Previous Articles Next Articles
Qin Chao
Received:
Accepted:
Online:
Published:
Contact:
Abstract: Progress measurement is an important part of project control, and its comprehensiveness, accuracy and timeliness are directly related to the contractor’s mastery of project status. Due to the different characteristics of projects, the applicable progress measurement methods are different. This paper discusses the establishment, application, advantages and disadvantages of design progress measurement method based on document delivery status, which is widely used in overseas projects
Key words: bill of deliverables, WBS decomposition, weight assignment, measurement point establishment, control information integration
Qin Chao. Design Progress Measurement Based on Document Delivery[J].Petrochemical Design, 2019, 36(2): 65-68.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://syhgsj.sei.com.cn/EN/10.3969/j.issn.1005-8168.2019.02.017
http://syhgsj.sei.com.cn/EN/Y2019/V36/I2/65
Cited