EOEG装置,CO?脱除塔,设备布置,管道布置 ," /> EOEG装置,CO?脱除塔,设备布置,管道布置 ,"/> EO/EG plant,CO? removal;equipment layout; piping design ,"/> <p class="MsoNormal" style="text-align:center !msorm;"> <b><span><span class="msoIns">Equipment</span></span></b><b><span><span class="msoIns">Layout</span>a<span class="msoIns">nd Piping Design of CO₂ Removal Unit</span>in<span class="msoIns">EO/EG</span>P<span class="msoIns">lant</span><span class="msoIns"></span></span></b>

Petrochemical Design ›› 2025, Vol. 42 ›› Issue (2): 52-55.

• PIPING TECHNOLOGY • Previous Articles     Next Articles

EquipmentLayoutand Piping Design of CO₂ Removal UnitinEO/EGPlant

Xiang Shuting   

  1. SINOPEC Engineering Incorporation, Beijing, 100101
  • Online:2025-05-25 Published:2025-05-14

Abstract:

 In this article, the equipment layout and pipingdesign of CO? removalunitin ethylene oxide/ethylene glycol (EO/EG) plant are studied. Based on the analysis of process flow and operation requirements,the optimalequipment layout and piping design ofCO? removal towersystemare discussed in accordance with relevant standards, and thecharacteristicsand matters needing attention in thepiping design of CO?removal unit inEO/EG plantareanalyzed,providingtechnical support for the efficient and stable operation of theplant.

Key words: EO/EG plant')">

EO/EG plant, ;equipment layout; piping design ')">CO? removal;equipment layout; piping design