构架式塔基础;三种计算模型;自振周期对比分析
," />构架式塔基础;三种计算模型;自振周期对比分析
,"/>reinforced concrete frame foundation for tower-type equipment, three calculation models,comparison of period
,"/>
Comparison of the Period of Reinforced Concrete
Frame Foundation for Tower-type Equipment with Three Calculation Models Using PKPM
Petrochemical Design ›› 2025, Vol. 42 ›› Issue (2): 47-51.
• ENGINEERING AND APPLICATION • Previous Articles Next Articles
Comparison of the Period of Reinforced Concrete
Frame Foundation for Tower-type Equipment with Three Calculation Models Using PKPM
Jiao Yingying