Petrochemical Design ›› 2019, Vol. 36 ›› Issue (3): 56-.doi: 10.3969/j.issn.1005-8168.2019.03.015
• PIPING TECHNOLOGY • Previous Articles Next Articles
Li Lijuan, Geng Shu
Online:
Published:
Abstract:
PetroChina First Construction Corporation, Luoyang, Henan, 471023
Key words: Teflon-lined steel pipeline, construction, prefabricated assembly
Li Lijuan, Geng Shu. Construction Technology of Teflon-lined Steel Pipeline[J].Petrochemical Design, 2019, 36(3): 56-.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://syhgsj.sei.com.cn/EN/10.3969/j.issn.1005-8168.2019.03.015
http://syhgsj.sei.com.cn/EN/Y2019/V36/I3/56
Cited