Petrochemical Design ›› 2019, Vol. 36 ›› Issue (1): 63-66.doi: 10.3969/j.issn.1005-8168.2019.01.017
• HSE • Previous Articles
Chi Jun
Received:
Accepted:
Online:
Published:
Contact:
Abstract: This paper introduces the design principle, process, implementation and matters needing attention of the field control cabinet in petrochemical plant, which adopts positive pressure ventilation mode. For cabinets in hazardous areas, the explosion-proof requirements must be met. In order to achieve power supply before commissioning or startup, some practical suggestions are put forward, and the importance of the design of power supply system for cabinet is emphasized
Key words: petrochemical plant, positive pressure explosion, control cabinet
Chi Jun. Design and Test of Cabinet for Positive Pressure Explosion Control System in Petrochemical Plant[J].Petrochemical Design, 2019, 36(1): 63-66.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://syhgsj.sei.com.cn/EN/10.3969/j.issn.1005-8168.2019.01.017
http://syhgsj.sei.com.cn/EN/Y2019/V36/I1/63
Cited