煤化工 , 项目管理 , 计划与进度控制 ," /> 煤化工 , 项目管理 , 计划与进度控制 ,"/> <p class="MsoNormal"> <b><span>Application of Progress Detection System in Large Coal to Chemical EPC Projects</span></b>

Petrochemical Design ›› 2022, Vol. 39 ›› Issue (3): 46-47.doi: 10.3969/j.issn.1005-8168.2022.03.012

• ENGINEERING AND APPLICATION • Previous Articles     Next Articles

Application of Progress Detection System in Large Coal to Chemical EPC Projects

Fang Xiaowen   

  1. Shenhua Engineering Technology Company Limited, Beijing, 100010
  • Received:2022-04-28 Online:2022-08-25 Published:2022-08-30

Abstract:

With the characteristics of long construction period, large capital investment, complex technology, remote construction site and poor surrounding support, coal to chemical projects are easily affected by various factors during construction. Combined with the characteristics of coal to chemical projects, this paper takes a project as an example to discuss how to establish a progress detection system for the project to achieve the goal of progress control.

Key words: coal to chemical, project management, plan and schedule control