设计管理,设计质量,质量提升,EPC项目 ," /> 设计管理,设计质量,质量提升,EPC项目 ,"/> <b>外资化工<span>EPC</span>项目设计质量提升实践</b>

石油化工设计 ›› 2026, Vol. 43 ›› Issue (3): 63-66.doi: 10.3969/j.issn.1005-8168.2026.03.012

• 综述 • 上一篇    下一篇

外资化工EPC项目设计质量提升实践

马振明   

  1. (东华工程科技股份有限公司,安徽 合肥 230024)

  • 收稿日期:2025-05-24 出版日期:2026-08-25 发布日期:2026-09-08
  • 作者简介:马振明,男,东华工程科技股份有限公司,安徽合肥,高级工程师,目前从事项目管理和化工工艺设计工作,中国科学技术大学工程硕士学位。

Practices of Design Quality Improvement for Foreign-funded Chemical EPC Projects

Ma Zhenming   

  1. (East China Engineering Science and Technology Co., Ltd., Hefei, Anhui, 230024)

  • Received:2025-05-24 Online:2026-08-25 Published:2026-09-08

摘要:

国内工程公司承揽外资化工EPC项目的过程中,设计质量是决定项目成败的关键因素。实践中暴露出诸多共性问题:设计交付物无完全满足合同要求;设计文件过程质量管理缺失;专业负责人缺乏统筹管理能力;三维模型及数字化交付重视度不够;项目会议管控不到位。针对上述问题,提出了系统性解决方案:通过持续深化合同研读,将技术要求融入设计全流程,确保交付物合规;重视三维建模与多专业协同设计,确保三维模型与现场实体一致;针对项目设计难点问题开展专项研究,依托专题讨论与专家论证等方式;实施分阶段模型审查的表单化管理;推动传统的校审模式转型,整合专业校审、信息化检查与全流程质量监管,优化全过程管理。旨在为提升外资化工EPC项目设计质量管理水平提供实践指导,助力国内工程公司增强国际市场竞争力。

关键词: 设计管理')">

设计管理, 设计质量, 质量提升, EPC项目

Abstract:

During the execution of foreign-funded chemical EPC projects by domestic engineering companies, design quality has become one of the key factors determining the success or failure of projects. Many common problems have emerged in practices, e.g., the design deliverables fail to fully meet the contractual requirements, the process quality management for design documents is lacking, the discipline leads lack overall planning and management capabilities, inadequate attention is paid to 3D models and digital delivery, and the management and control of project meetings are not given due emphasis. To address these problems, this paper proposes some systematic solutions, including continuously deepening contract review to integrate the technical requirements into the whole design process to ensure the compliance of deliverables with contractual terms, prioritizing 3D modeling and multi-disciplinary collaboration to ensure the consistency between the 3D models and the on-site entities, conducting specialized research on key and difficult issues in project design through thematic discussions and expert evaluations, implementing a form-based mechanism for phased model reviews, and reforming traditional review methods by integrating professional reviews, information-based inspections and whole process quality supervision to optimize the whole process management. This paper aims to provide practical guidance for improving design quality management in foreign-funded chemical EPC projects and help domestic engineering companies enhance their international market competitiveness.